Abstract:
The grower or the plant physiologist has to find out the best cultivation method.
For each growers action to promote or to protect plant growing a work method is used.
A connection between a stated cultivation method and the specific work methods is called production method.
The way is shown, to calculate the working time requirement of a production method for an individual holding, when the data of the influences on the working time are known.
|